How we work / Montenegro

More than a set
of measurements

A new sail is not ordered by choosing a model and a size. It has to match the boat, the rig, the hardware and the way she is sailed.

You do not need to know every technical term.That is our job.

Measured on the boat

The details prevent expensive mistakes

What must be checked depends on the sail and its installation. We work through the relevant measurements, fittings and finishing choices before the order goes into production.

01

Rig and sail geometry

Hoist, luff, leech and foot dimensions; mast, boom, tack and clew positions.

02

Attachments and hardware

Luff slides or track, tack and clew fittings, reefing details and foot finish.

03

Handling systems

Furler model, sheeting positions, blocks and the accessories the finished sail must work with.

04

Use and sailing plan

How the boat is sailed, by whom, in which conditions and what needs to work better.

From boat to fitted sail

One responsible
process

  1. 01
    Inspect & measure

    We check the boat and record the details required for that sail and installation.

  2. 02
    Specify

    Cut, construction, cloth, finishing and handling are matched to the boat and its use.

  3. 03
    Verify & order

    The specification is checked before it is sent for professional sailmaking.

  4. 04
    Deliver to Montenegro

    Your sail arrives locally, without leaving you to coordinate an international order alone.

  5. 05
    Fit on board

    When agreed, we install it, check the setup and make sure it is ready to use.

Local expertise

The right sail is finished at the boat

Rolly Tasker brings the sailmaking experience. SailPoint Adria adds the local knowledge and practical work that turns the specification into the right fit for your boat.

Splicing and rigging details can be included where they form part of the agreed installation.

Start with your boat